Calculation first,
then concrete.
In a quarter century we delivered 42 projects on the date we promised. Now Kale Kule is rising on the Kartal hills, with the same careful calculation beneath every floor.
Projects
We take on few projects and finish what we take on. Our whole portfolio is in two cities, on sites we can inspect within walking distance.
PRJ 01 / RESIDENTIALKale Kule
Kartal, Istanbul
34 floors · single tower · 214 homes
Delivery Q2 2027
PRJ 02 / RESIDENTIALKale Orman
Çekmeköy, Istanbul
9 blocks · 5 floors · 96 homes
Delivery Q4 2026
PRJ 03 / RESIDENTIALKale Marin
Mudanya, Bursa
12 blocks · 4 floors · 148 homes
Delivered in Q3 2024
PRJ 04 / URBAN RENEWALKale Rıhtım
Tuzla, Istanbul
21 floors · 2 blocks · 180 homes
Delivery Q1 2028
PRJ 05 / RESIDENTIALKale Bahçe
Nilüfer, Bursa
6 blocks · 4 floors · 84 homes
Delivered in Q2 2023
05 / 05 · THE FULL LIST IS ON THE PROJECTS PAGE
Building Safety Report
We set out the technical reality of every home we sell on a single page. Every figure, from concrete class to insulation value, comes from independent inspection reports; it is not marketing copy.
The preview below is taken from the current Kale Kule report. The full report is available at the sales office and on the project page.
- Concrete Class
- C40/50
- Seismic Code
- TBDY 2018
- Soil Survey
- Class ZC
- Thermal Insulation
- U = 0.28 W/m²K
A five-frame record of the Kale Kule site shot from the same angle: excavation and foundations, structure, facade, finishing and handover. The frames blend into one another as the page scrolls.
KALE KULE SITE RECORD
From the site

The 21st floor slab was poured; samples were delivered to the laboratory for the 28-day compressive strength test.
Acceptance of the external insulation on the south facade is complete and scaffold removal has begun. The show flat opens for visits on 12 September.
Principles we write into the contract
On-time delivery approach
The delivery date is written into the contract; the site schedule is updated on this website every two weeks. If the schedule slips, you are the first to know.
DetailsDesign to the TBDY 2018 seismic code
Every project is designed to the seismic code in force; the soil survey and concrete class are stated openly in the report with a document number.
DetailsTitle deed and contract transparency
The contract text is the same for everyone. Payment plan, title transfer and handover terms are in your hands in writing before you sign.
DetailsAfter-handover support
The relationship does not end with the keys: the handover file, the residents' guide and a single request line stay with you; every request receives a tracking number.
DetailsAreas of Activity
Housing Development
Housing projects from land analysis to turnkey handover, from low-rise to tower.
ViewUrban Renewal
End-to-end renewal management from risk assessment to owner agreements.
ViewCommercial Buildings
Street retail and office-scale commercial space integrated with housing projects.
ViewContracting Services
Structural and finishing works on third-party buildings, with our own site discipline.
ViewNews
NEWS / 02/09/2026Emergency evacuation drill held at the Kale Kule site
All crews at the Kartal site took part in an unannounced evacuation drill during the morning shift; the time taken to reach the assembly point was recorded.
NEWS / 28/08/2026Structural works at Kale Kule reach 78 percent
The 21st floor slab was poured at the 34-storey tower in Kartal; concrete samples were sent for the 28-day compressive strength test.
ANNOUNCEMENT / 25/08/2026Preliminary request period opens at Kale Rıhtım
Pre-sale preliminary registration has opened for the urban renewal project in Tuzla; those registered will be the first to hear about the price list after the permit.