Property owner pre-application period in Tuzla
Owner meetings for the Kale Rıhtım block continue until the end of December; the meeting schedule is issued by the head office.
In a quarter century we delivered 42 projects on the date we promised. Now Kale Kule is rising on the Kartal hills, with the same careful calculation beneath every floor.
We take on few projects and finish what we take on. Our whole portfolio is in two cities, on sites we can inspect within walking distance.
PRJ 01 / RESIDENTIALKartal, Istanbul
34 floors · single tower · 214 homes
Delivery Q2 2027
PRJ 02 / RESIDENTIALÇekmeköy, Istanbul
9 blocks · 5 floors · 96 homes
Delivery Q4 2026
PRJ 03 / RESIDENTIALMudanya, Bursa
12 blocks · 4 floors · 148 homes
Delivered in Q3 2024
PRJ 04 / URBAN RENEWALTuzla, Istanbul
21 floors · 2 blocks · 180 homes
Delivery Q1 2028
PRJ 05 / RESIDENTIALNilüfer, Bursa
6 blocks · 4 floors · 84 homes
Delivered in Q2 2023
05 / 05 · THE FULL LIST IS ON THE PROJECTS PAGE
Owner meetings for the Kale Rıhtım block continue until the end of December; the meeting schedule is issued by the head office.
Design consultancy on our sister platform for homeowners taking delivery; with the floor plan and handover file ready, the survey is short.
The Mudanya sales office is open for walk-in visits at weekends; the show flat and the estate management office are seen on the same tour.
We set out the technical reality of every home we sell on a single page. Every figure, from concrete class to insulation value, comes from independent inspection reports; it is not marketing copy.
The preview below is taken from the current Kale Kule report. The full report is available at the sales office and on the project page.
A five-frame record of the Kale Kule site shot from the same angle: excavation and foundations, structure, facade, finishing and handover. The frames blend into one another as the page scrolls.
KALE KULE SITE RECORD

The 21st floor slab was poured; samples were delivered to the laboratory for the 28-day compressive strength test.
Acceptance of the external insulation on the south facade is complete and scaffold removal has begun. The show flat opens for visits on 12 September.
The delivery date is written into the contract; the site schedule is updated on this website every two weeks. If the schedule slips, you are the first to know.
DetailsEvery project is designed to the seismic code in force; the soil survey and concrete class are stated openly in the report with a document number.
DetailsThe contract text is the same for everyone. Payment plan, title transfer and handover terms are in your hands in writing before you sign.
DetailsThe relationship does not end with the keys: the handover file, the residents' guide and a single request line stay with you; every request receives a tracking number.
DetailsHousing projects from land analysis to turnkey handover, from low-rise to tower.
ViewEnd-to-end renewal management from risk assessment to owner agreements.
ViewStreet retail and office-scale commercial space integrated with housing projects.
ViewStructural and finishing works on third-party buildings, with our own site discipline.
ViewThe contract said delivery in September 2024; we received the keys at the end of August. The handover file included the building report and every test result, so we never had to ask afterwards.
We have lived here for over two years; the winter insulation performs as the report says. Estate management was handed over with minutes, and first-year maintenance items were covered by the company.
Since buying at Kale Kule, site progress has arrived every two weeks on the website and by e-mail. I can see which floor has been poured without calling the sales office.
NEWS / 02/09/2026All crews at the Kartal site took part in an unannounced evacuation drill during the morning shift; the time taken to reach the assembly point was recorded.
NEWS / 28/08/2026The 21st floor slab was poured at the 34-storey tower in Kartal; concrete samples were sent for the 28-day compressive strength test.
ANNOUNCEMENT / 25/08/2026Pre-sale preliminary registration has opened for the urban renewal project in Tuzla; those registered will be the first to hear about the price list after the permit.